There has been a little progress but not much.
Thursday, Ameren IP came and installed the 400 amp service upgrade, the electrician switched our house to one meter, the pool will be on separate meter now so I can monitor usage separately.
Friday, the proper geothermal heat pump arrived. Thank goodness! Tim indicated his plan is to have it up and running by the end of next week. That would be wonderful.
Deb has been trying to keep up with weeding and gardening, but the weeds are winning in a lot of areas.
Kitchen progress--not much. With a neighbor's help, Chris, Deb and I got the patches on the ceiling where the soffits were. The kitchen is cooler and smells better now! I am still bogged down in wiring, now I cant get the circuit to work that has the GFCI's. I am suspicious I have a bad GFCI, going to try a different one next. I still have the dedicated lines for the micro, dishwasher and computer to wire, then tear out and patch the floors where the old cabinets were. Then I can get to drywall installation on the walls. Then, we can move to doing the lights in the mudroom and bathroom. It seems so far away. Its more difficult now with my working a full 40 hr week again.
Saturday, August 16, 2008
Subscribe to:
Posts (Atom)